22 $
Description
Instructions for 01-154-16:
- 1- Attach yellow wire to OEM yellow wire
- 2- Attach red wire to OEM red wire
- 3- Attach black wire to ground chassis (Ground)
- 4- Attach yellow wire to green wire on OEM engine wiring
Extensive catalog of ATVs, UTVs, side-by-sides, quad bikes, parts, tires, protective gear, and accessories
Powersports vehicle detail
22 $